Asbestos Removal in Norwalk

At Norwalk Asbestos Removal, we make asbestos removal quick and easy for homeowners and property managers alike. Our proven methods include a decade of experience, reliable professionals, guaranteed work, and affordable pricing. Call now for a free, personalized quote, no obligation.

For us, every project is unique and we always focus on your home's needs. Whether you are refreshing one unit or preparing a larger renovation, we begin with the building's use and the desired end result. Flooring, ceiling finishes, insulation and exterior materials all get their own place in our careful planning. Scroll down to learn more about asbestos removal and our unique approach.

Single-story light yellow stucco house with a low brown roof, a front lawn, trimmed hedges and an attached garage with a white door, seen from the street under a clear sky.
Asbestos testing and surveysPopcorn ceiling removalFloor tile and mastic removalDrywall, joint compound and plaster removalHVAC duct and pipe insulation removalRenovation and demolition abatement

Our asbestos services

Sunlit stairwell in an empty house with a textured ceiling, pale square patches on the wall beside the stairs, and drop cloth and a few loose papers on the floor.Empty living room with a textured popcorn ceiling, plain white walls, worn beige carpet, a sliding glass door and a window looking out to trees, and a doorway to a hall.

Asbestos testing and surveys

Whoever samples your house needs Cal/OSHA certification and EPA Building Inspector training. The lab report lists every sample, where it came from and what it contains, and the work plan starts from it.

Popcorn ceiling removal

A textured ceiling gets sampled before anyone scrapes it. If the lab finds asbestos, we plan the removal room by room, file the district notice and handle the waste the way California requires for friable asbestos.

Kitchen floor of cream and tan tiles lifted in places to show black adhesive and bare subfloor, with wood cabinets partly covered in plastic sheeting and a window at the left.Gutted bathroom with a bathtub set in an open stud wall, teal and pink tile on the right-hand wall, small white floor tile, a ceiling vent and plastic sheeting hung at the left.

Floor tile and mastic removal

Tile, sheet vinyl and the adhesive under them are sampled together. A newer floor laid over an old one is not skipped either, since the district’s survey runs down to the joists.

Drywall, joint compound and plaster removal

Wallboard, joint compound and plaster are sampled as part of the wall, along with material in wall and ceiling cavities as necessary. We remove what the lab report calls for and file the district notice when the job needs one.

Attic with round silver-gray ducts running along the rafters, plank flooring, loose insulation along both sides and a small vent window at the far end.Empty room with the walls and windows covered in clear plastic sheeting, a bare wood floor and a light blue-gray portable air machine with a flexible hose, no people.

HVAC duct and pipe insulation removal

Removing or replacing a heating and air system counts as renovation under the district’s rule. We sample duct wrap, seam tape and pipe insulation first, then plan the removal around your HVAC contractor’s schedule.

Renovation and demolition abatement

Before a remodel, addition or teardown, the survey comes first. Pulling out a bearing wall counts as demolition under the rule, and every demolition needs a district notice. We clear the asbestos ahead of the building crew.

Asbestos testing and removal costs

More than 8 in every 10 Norwalk homes were built before 1980, making asbestos a common issue in our community. Our price ranges cover hired labor, materials, containment, lab fees and disposal for typical jobs in Norwalk, Whittier and La Mirada. Expect the low figure for a small job with easy access, and the top for bigger areas, occupied buildings, second stories or extra air tests.

Asbestos testing and surveys

  • Testing for a small remodel, a few samples$400 – $800+
  • Whole-house survey before a remodel or demolition$600 – $1,500+
  • Air test after removal (clearance)$400 – $1,000+
What is included

A Cal/OSHA-certified consultant or technician takes the samples, a lab reads each one and you get a written report. The air test after removal is booked with an independent consultant and priced as its own line.

Get a free quoteSee an example project

Popcorn ceiling removal

  • One room, about 150–250 sq ft of ceiling$1,500 – $4,000+
  • Several rooms, about 600–1,000 sq ft of ceiling$4,000 – $9,000+
  • Whole house, about 1,200–2,000 sq ft of ceiling$7,500 – $17,000+
What is included

The rooms sealed in plastic with air filters running, the ceiling wetted and scraped, bagged disposal and a final cleanup. Patching, new texture and paint are priced separately.

Get a free quoteSee an example project

Floor tile and mastic removal

  • One bathroom or laundry floor, up to about 100 sq ft$1,200 – $3,000+
  • Kitchen floor, about 200–300 sq ft$2,000 – $5,000+
  • Several rooms of flooring, about 1,000 sq ft$5,000 – $12,000+
What is included

The area sealed off, tile or sheet vinyl lifted, the black glue under it removed where it tested positive, then bagged disposal and a cleanup. New flooring is not included.

Get a free quoteSee an example project

Drywall, joint compound and plaster removal

  • One wall or a new doorway, up to about 100 sq ft$1,200 – $3,000+
  • One room of walls, about 350–450 sq ft$3,000 – $7,000+
  • Whole-house walls and ceilings, about 1,500 sq ft home$15,000 – $40,000+
What is included

Plastic containment with air filters, wall or ceiling material that tested positive taken out wet, bagged disposal and a cleanup. New drywall and paint are not included.

Get a free quoteSee an example project

HVAC duct and pipe insulation removal

  • Duct wrap at the furnace or a few duct joints$1,200 – $3,000+
  • All attic ducts in a house, removal only (new ducts extra)$2,500 – $6,500+
  • Pipe or boiler insulation, up to about 50 ft$1,000 – $2,500+
What is included

A sealed work area in the attic or furnace closet, the wrap, tape or insulation that tested positive removed and bagged, and a cleanup. New ducts or insulation are a separate price.

Get a free quoteSee an example project

Renovation and demolition abatement

  • Kitchen or bathroom remodel, one or two materials$2,000 – $5,500+
  • Whole-house remodel or teardown, several materials$15,000 – $40,000+
What is included

Materials that tested positive come out before the remodel or demolition crew starts, with containment, bagged disposal and a cleanup. The survey and the district notification fee are billed on top.

Get a free quoteSee an example project

Stucco removal

  • Stucco around one window or door$1,200 – $3,000+
  • Stucco on one wall or an addition, about 200–400 sq ft$3,000 – $8,000+
  • Stucco on a whole house, about 1,500–2,000 sq ft of wall$15,000 – $40,000+
What is included

Plastic around the work area, stucco that tested positive cut out wet, bagged disposal and a cleanup. New lath, stucco or siding is not included.

Get a free quote

Cement siding removal

  • Cement siding on one wall or a garage, about 200–400 sq ft$2,000 – $5,000+
  • Cement siding on a whole house, about 1,500–2,000 sq ft$11,000 – $24,000+
What is included

Whole pieces taken off by hand while wet, wrapped and sealed, then hauled with a cleanup of the grounds. New siding is extra.

Get a free quote

Ranges are 2026 estimates, not quotes. Call today for a free, personalized quote.

Owner-occupied homes and the district’s advice

In Norwalk 78.1 percent of homes are one-unit homes, and 31.7 percent of households rent. The district has a provision for owners who live in their own house, and it has narrow limits.

Rule 1403 does not apply to an owner-occupant of a residential single-unit dwelling when that owner personally conducts a renovation activity there. The district’s own advice goes with it. South Coast AQMD does not recommend that a home-owner remove asbestos, because of the potential for exposure and cross contamination.

Narrow conditions apply. The owner lives in the house, and the house is neither vacant nor a rental or business. The renovation has to be the owner’s own work, so laborers, friends and relatives cannot step in. Demolition is excluded, and asbestos waste carried outside the house stays under the rule. We ask that you not take samples yourself.

Houses from the 1950s

Half of Norwalk’s homes were built in or before 1957, so the 1950s sit at the middle of the stock. Only 15.4 percent were built before 1950, and more than 8 in every 10 were built before 1980.

No build year exempts a house here, because the district’s survey rule has no age cutoff. This site covers popcorn texture on ceilings, floor tile with its adhesive, plaster, joint compound and duct wrap, and a lab test shows which of them are in your house.

Apartments are a smaller part of Norwalk’s housing, with 16.9 percent of homes in buildings of five or more units. Because apartment buildings, townhouses and condominiums sit outside the district’s single-unit category, the survey carve-out and owner-occupant provision in this section stop short of them.

Kitchen and bath remodels

Kitchen and bath remodels open up more than the surface. Samples go through each flooring layer to the joists and into any wall or ceiling cavity that has to be sampled to identify what is inside.

“Do I need a survey for a small bathroom?” Not always. A renovation in a single-unit house that removes less than 100 square feet of surface area of asbestos-containing material is excused from the survey by the district, though work practices and waste rules still apply. Only a sample tells you how much material is involved.

Demolition permits and the notification copy

Whether you live in the house, rent it out or inherited it, a contractor’s job needs the district notice no later than 10 working days before the work starts, unless it is a renovation that removes less than 100 square feet of asbestos-containing material. A teardown always needs a district notice before demolition.

Our abatement crew files the notice through the district’s online web application, and the district does not treat a notice as received without its notification fee. For a demolition permit, the district says state law has the applicant hand the local building and safety office a copy.

Norwalk’s building permits page lists demolition among the work that needs a permit. The asbestos steps come from the district and the state, so confirm the details for your address with Norwalk’s Building and Safety Division or the district’s asbestos hotline at (909) 396-2336.

Our process

01

Samples and a site visit

Work starts with samples, since the district rule calls for a survey prior to any demolition or renovation activity. Sampling is done by someone with EPA Building Inspector training who holds Cal/OSHA certification as a consultant or technician, and the lab results then shape our plan.

02

District notice and containment

When the job needs the district notice, we file it online and plan on at least 10 working days before the start date. Then we set up containment around the work area.

03

Removal, disposal and air testing

The hauler is licensed, and the manifest that comes with the load shows friable asbestos waste leaving as hazardous waste. An independent consultant, not our crew, does the clearance air testing.

Serving Norwalk, Whittier and La Mirada

We also serve Whittier and La Mirada. Call us for confirmation if your address is outside the area.

Frequently asked questions

Who takes the samples?

Someone certified by Cal/OSHA with EPA Building Inspector training. Asbestos consulting itself belongs to a Cal/OSHA-Certified Asbestos Consultant, which is one more reason to leave the sampling to them.

Does a rental house follow different rules?

The owner-occupant provision is for an owner who lives in the house, so a landlord does not have it. Apartment buildings, townhouses and condominiums are outside the single-unit definition altogether.

What does the district notice cost?

A notification fee goes to the district with the notice, and the notice does not count as received until the fee arrives. The fee depends on how much asbestos is removed, and the district sets the amount, so ask us when you call.

Who tests the air when the job is done?

A separate consultant does. Removal contractors cannot provide clearance air monitoring under California’s business and professions rules, so the crew never tests its own air.

How do I check a contractor before I hire?

Ask for the license number first, then check it with the Contractors State License Board. On any job of 100 square feet or more of asbestos material, the company must hold the C-22 Asbestos Abatement classification, or have a qualifier with a passing result on the asbestos certification exam, and the employer must be registered with Cal/OSHA.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (562) 521-8474

Call (562) 521-8474